Thursday, August 08, 2019

F-35 achieved a Fully Capable Mission Rate of 8.7% in June, up from 4.7% in the previous month...

Thanks to Donno for the link!


via POGO
The F-35 Joint Strike Fighters in the operational test fleet at California’s Edwards Air Force Base are suffering from low readiness rates that may threaten the successful completion of the crucial combat-testing phase of the program, as shown in a chart created by the Joint Program Office’s Integrated Test Force and obtained by the Project On Government Oversight (POGO).

The revelation that the F-35 program is struggling to overcome the last hurdle before it can legally move into full-rate production follows numerous recent reports, including by POGO as well as the Government Accountability Office, indicating the most expensive weapon system in history is far from ready to face current or future threats.

The 23 aircraft in the test fleet achieved an abysmal “fully mission capable” rate of 8.7 percent in June 2019 according to the chart, which covers December 2018 through mid-July 2019. A fully mission capable aircraft can perform all of its assigned missions, a particularly important readiness measure for multi-mission programs such as the F-35. The June rate was actually an improvement over the previous month, when the fleet managed a rate of just 4.7 percent. Since the beginning of operational testing in December 2018, the fleet has had an average fully mission capable rate of just 11 percent.
Story here. 

No comments :

Post a Comment

Note: Only a member of this blog may post a comment.